Chapel Restoration Closed Until Aug. 31

Air conditioning being installed

The Chapel Restoration in Cold Spring will be closed through Aug. 31 for the installation of air conditioning and electrical system updates. It will reopen in September for weddings and performances, including five Sunday Music Series concerts.

The project includes the burial of overhead electrical lines from the street to the chapel and moving outdoor circuit breaker boxes indoors. The 40-year-old electrical wiring will be replaced and the lighting upgraded to low-voltage LED.

Donations are welcome; see chapelrestoration.org or write P.O. Box 43, Cold Spring, NY 10516.

Comments are closed.