Repairs to Beacon street to finish in summer 

The $9 million repair and repaving of Fishkill/Teller Avenue in Beacon will resume on Monday (March 10) after pausing for the winter.

The contractor will finish Teller Avenue (the street’s name south of Main Street) first, including milling and paving, and then move to Fishkill Avenue, where plans to replace sidewalks on the north side of the street have expanded, now stretching from Blackburn Avenue to Mill Street.

The city hopes to complete the repairs, which also include replacing drainage structures, and repave the street by July.

Behind The Story

Type: News

News: Based on facts, either observed and verified directly by the reporter, or reported and verified from knowledgeable sources.

Articles attributed to "staff" are written by the editor or a senior editor. This is typically because they are brief items based on a single source, such as a press release, or there are multiple contributors, such as a collection of photos.